All posts by Lukas Hörtnagl

Short Report – QA/QC Meeting Jan 2020

Meeting Date: 9 Jan 2020  Participants LH, AS, MG, WE, TB, SG (6)    Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please prepare short statement about your site and send to to LH . . . Read more

Short Report – QA/QC Meeting Dec 2019

Meeting Date: 12 Dec 2019  Participants LH, MG, AS, PL, MS, SG, YaL, IF, RM, WE, KM, +1 Bac (12)    Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please prepare short statement about . . . Read more

Short Report – QA/QC Meeting Nov 2019

Meeting Date: 14 Nov 2019  Participants LH, MG, RM, PM,SB, TB, MS, IF, SG (9)    Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please prepare short statement about your site and send to . . . Read more

Short Report – QA/QC Meeting Oct 2019

Meeting Date: 17 Oct 2019  Participants LH, MG, RM, IF, WE (5)    Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please prepare short statement about your site and send to to LH (max. . . . Read more

CH-DAV: 2013

Notes –   Current FF-202101 Setup: Non-ICOS Setup 1997-2016 (ETH binary files) Time Period(s): IRGA72: 2013_1, 2013_2; IRGA75: 2013_2 Instruments: R350, IRGA75, IRGA72 Final Flux Version: R350-IRGA72-IRGA75_FF-202101 Scripts: FR 0.5.0 with EddyPro 7.0.6, DIIVE v0.21.0, SCOP v0.1 (IRGA75 self-heating correction) Flux Levels: Level-1: Level-1_ID2021-05-01T120000 Level-1.1: (IRGA75 only) EFDC-ID20210630 Level-2: – . . . Read more

CH-DAV: 2016

Notes –   Current FF-202101 Setup: Non-ICOS Setup 1997-2016 (ETH binary files) and ICOS Setup since 2014 (ETH binary files) Time Period(s): IRGA72: 2016_1, 2016_2 (ICOS setup); IRGA75: 2016_1 Instruments: R350, HS-50, IRGA75, IRGA72 Final Flux Version: R350-HS50-IRGA72-IRGA75_FF-202101 Scripts: FR 0.5.0 with EddyPro 7.0.6, DIIVE v0.21.0, SCOP v0.1 (IRGA75 self-heating . . . Read more

Short Report – QA/QC Meeting Sep 2019

Meeting Date: 19 Sep 2019  Participants LH, IF, SG, MG, AR, YaL, PL, BS (8)    Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please prepare short statement about your site and send to . . . Read more

CH-DAV: 2017

FF-201908 Setup ICOS Setup since 2014 (ETH binary files) Time Period(s) 2017_1, 2017_2 Instruments HS50, QCL Final Flux Version HS50-QCL_FF-201908 Scripts FCT 0.92, EP 7.0.4 (Level-1), Amp 0.5.0-indev (Level-2) Level-1 ID Level-1_ID2019-08-30T054936 / 2017_1 in ID2019-08-29T151954, 2017_2 in ID2019-08-29T152007 Level-2 ID Level-2_AMP-20190830-181208 * Level-3-4 ID (not generated by FLUXNET) Initiative . . . Read more

CH-DAV: 2016

FF-201908 Setup ICOS Setup since 2014 (ETH binary files) Time Period(s) 2016_1, 2016_2 Instruments HS50, QCL Final Flux Version HS50-QCL_FF-201908 Scripts FCT 0.92, EP 7.0.4 (Level-1), Amp 0.5.0-indev (Level-2) Level-1 ID Level-1_ID2019-08-30T125741 / 2016_1 in ID2019-08-29T151919, 2016_2 in ID2019-08-29T151934 Level-2 ID Level-2_AMP-20190830-181208 * Level-3-4 ID (not generated by FLUXNET) Initiative . . . Read more

New Article: Defining The Correct Lag-time

In some cases, e.g. when using a new instrument that was never used before, it is not known in which team window the maximum covariance between tubulent wind and the scalar of interest (CO2, H2O, etc…) should be searched.Therefore, it is recommended to first search for lag times in a . . . Read more

Short Report – QA/QC Meeting August 2019

Meeting Date: 22 Aug 2019 Participants  LH, SG, IF, RM, EPL, SB, PM, TB, MG (9)   Talking Points Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please prepare short statement about your site . . . Read more

New Site Info Added

New site descriptions have been updated for sites CH-CHA, CH-FRU and CH-OE2. Also available now is management info for CH-FRU and info about the crop rotation at CH-OE2. Site info will be further expanded in the near future. 

Short Report – QA/QC Meeting June 2019

Meeting Date: 27 June 2019 Participants SG, SB, PL, EPL, RM, PM, MG (7)   Talking Points Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please prepare short statement about your site and send . . . Read more

Short Report – QA/QC Meeting May 2019

Meeting Date: 29 May 2019 Participants LH, MG, SG, WE, PM, RM (6)   Talking Points Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please prepare short statement about your site and send to . . . Read more

Short Report – QA/QC Meeting Apr 2019

Meeting Date: 2 May 2019 Participants LH, SG, IF, MG, RM, TB, PM, PL, EPL (9)   Talking Points Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please prepare short statement about your site . . . Read more

Flux Levels Refined

Currently the eddy covariance flux result outputs are re-ordered in a new folder structure using Flux Levels. Today, the Flux Levels were further refined to be more in line with definitions used in FLUXNET. In addition to Level-0, Level-1 and Level-2, there is also Level-3 (refined) and Level-4 (new). FLUXNET . . . Read more

CH-DAV: 2018

FF-201902 Setup ICOS Setup since 2014 (ETH binary files) & ICOS Setup since 2018 (ICOS csv files) Time Period(s) 2018_1-2-3-6, 2018_4, 2018_5 (results were merged) Instruments HS50, IRGA72 Final Flux Version HS50-IRGA72_FF-201902 Scripts FCT 0.86, EP 6.2.0 (Level-1), FM 0.92 (Level-1 merging),  FQC 1.04 (Level-2) Level-1 ID Level-1_ID2019-03-02T164252 / merged . . . Read more

CH-DAV: 2017

FF-201902 Setup ICOS Setup since 2014 (ETH binary files) Time Period(s) 2017_1, 2017_2 (results were merged) Instruments HS50, IRGA72 Final Flux Version HS50-IRGA72_FF-201902 Scripts FCT 0.86, EP 6.2.0 (Level-1), FM 0.91 (Level-1 merging), FQC 1.03 (Level-2) Level-1 ID Level-1_ID2019-02-25T202725 / merged results from: ID2019-02-22T210636, ID2019-02-22T210659 / ** Level-2 ID Level-2_QC-20190225-222207 . . . Read more

CH-DAV: 2016

FF-201902 Setup ICOS Setup since 2014 (ETH binary files) Time Period(s) 2016_1, 2016_2 (results were merged) Instruments HS50, IRGA72 Final Flux Version HS50-IRGA72_FF-201902 Scripts FCT 0.86, EP 6.2.0 (Level-1), FM 0.91 (Level-1 merging), FQC 1.03 (Level-2) Level-1 ID Level-1_ID2019-02-25T194303 / merged results from: ID2019-02-22T210545, ID2019-02-22T210559 / ** Level-2 ID Level-2_QC-20190225-220252 . . . Read more