CH-DAV: 2016

FF-201908

Setup ICOS Setup since 2014 (ETH binary files)
Time Period(s) 2016_1, 2016_2
Instruments HS50, QCL
Final Flux Version
HS50-QCL_FF-201908
Scripts FCT 0.92, EP 7.0.4 (Level-1), Amp 0.5.0-indev (Level-2)
Level-1 ID
Level-1_ID2019-08-30T125741 / 2016_1 in ID2019-08-29T151919, 2016_2 in ID2019-08-29T151934
Level-2 ID Level-2_AMP-20190830-181208 *
Level-3-4 ID (not generated by FLUXNET)
Initiative Methane Synthesis 2019, N2O ILTER Initiative (upload 30 Aug 2019)
Flux Calculations By
LH
Meteo Screening By
MG

 

Notes

  • First fluxes that were quality-controlled using Amp.
  • Spectral correction Fratini et al. (2012) did not work, switched to Horst et al. (1997) instead.

 

* Level-2 uploaded to European Fluxes Database Cluster for FLUXNET data sharing

Last Updated on 13 Aug 2020 12:47