CH-DAV: 2013

FF-201909

Setup Non-ICOS Setup 1997-2016 (ETH binary files)
Time Period(s) 2013_2
Instruments R350, IRGA72
Final Flux Version
R350-IRGA72_FF-201909
Scripts FCT 0.92, EP 7.0.4 (Level-1)
Level-1 ID
Level-1_ID2019-09-23T195553
Level-2 ID see Notes
Level-3-4 ID
Initiative Data for manuscript about IRGA comparison (Sabbatini et al.) (not uploaded to FLUXNET, see Notes)
Flux Calculations By
LH
Meteo Screening By
WE

 

Notes

  • For CH-DAV, we currently share IRGA75 fluxes for 2013 via FLUXNET. Here we also calculated the concurrently measured IRGA72 fluxes.
  • These fluxes were calculated to be shared for a manuscript that is in preparation at the time of writing (Sep 2019). The ms compares IRGA72 and IRGA75 fluxes during time periods where both instruments measured at the same site.
  • Level-2 fluxes can be created on demand.