All posts by Lukas Hörtnagl

Meeting Date: 2018-09-20 Participants / Excused LH, EPL, IB, TB, RM, MG, PM (7) / IF, MS Talking Points Info QA/QC Weekly checklist will be expanded: instead of adding Notes to the table, all technical Notes (errors) will be written directly in GIN. The link to the GIN entry will . . . Read more

[update] Updated on LH local, fresh install, to 5.2.0, downloaded here (Windows 64bit) [test] Tested CH-DAV QV generation on LH local with this version –> OK [update] On VPC in Anaconda prompt (as admin), ran conda update anaconda –> this updated conda from 4.3.21 to 4.3.30 [update] Still on VPC, . . . Read more

Meeting Date: 2018-08-23 Participants / Excused LH, IB, PL, MG, PM, CE, RM, SB (8) / EPL, WE, TB, IF, KF Talking Points Info Currently, automatic fluxes are calculated each day for the last 14 days. Most recent flux results are shown here (now deprecated), more information about the . . . Read more

Meeting Date: 2018-07-12 Participants / Excused LH, EPL, PM, IF, RM, KF, WE, MS, IB (9) / SB, MG, TB Talking Points Info Regarding GIN: RSS feed needed so that all news from GIN are automatically displayed on Swiss FluxNet homepage. DO will contact LH or LH will contact DO. . . . Read more

From now on, automatic fluxes for the QVs are shown for the last 14 days (previously 7 days). More information about QV fluxes are given here. Below you can find new fluxes between 1 July and 14 July 2018. CO2 Fluxes Latent Evaporation Fluxes Sensible Heat Fluxes

Newest fluxes between 24 June and 1 July 2018. CO2 Fluxes H2O Fluxes Sensible Heat Fluxes

Meeting Date: 2018-06-14 Participants / Excused LH, MG, EPL, KF, IF, PM (6) / PL, SB, RM Talking Points Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please send short statement about site to . . . Read more

From now on, the following data are plotted directly from the new LoggerNet files (instead of the old LANNER files): Basic Meteo (10_meteo) CH-DAV_CR1000_T1_35_1_TBL1_*.csv CH-DAV_iDL_T1_35_1_TBL1_*.dat Forest Floors (12_meteo_forestfloor) CH-DAV_CR1000_FF1_1_TBL1_*.csv CH-DAV_iDL_FF1_0_1_TBL1_*.dat CH-DAV_CR1000_FF2_1_TBL1_*.csv CH-DAV_iDL_FF2_0_1_TBL1_*.dat CH-DAV_CR1000_FF3_1_TBL1_*.csv CH-DAV_iDL_FF3_0_1_TBL1_*.dat CH-DAV_CR1000_FF4_1_TBL1_*.csv CH-DAV_iDL_FF4_0_1_TBL1_*.dat CH-DAV_CR1000_FF5_1_TBL1_*.csv CH-DAV_iDL_FF5_0_1_TBL1_*.dat CH-DAV_CR1000_FF1_1_TBL2_*.csv CH-DAV_iDL_FF1_0_1_TBL2_*.dat CH-DAV_CR1000_FF2_1_TBL2_*.csv . . . Read more

The ICOS DataFlow from CH-DAV to the ETH grassland server is now active. Filenames and variable names will soon be changed to their final ICOS file- & variable names. More info here: Dataflow Exception: at the moment 90_images_10_webcam files are transfered directly from the LANNER to the ETH grassland server.

13 Apr 2018: CH-OE2 activated. Running. 19 Apr 2018: CH-LAE activated. Running. 20 Apr 2018: CH-FRU activated. Running. 25 Apr 2018: CH-AWS activated. Running. 26 Apr 2018: CH-CHA IRGA75 activated. Running. 10 May 2018: CH-DAV IRGA72 activated. Running. All stations running, QCLs currently not in the field.

Date: 2018-05-17 Participants / Excused LH, IB, PM, MG, SB, WE, TB, RM, IF, KF, Kritika (internship) Talking Points Info Roadmap Site Reports CH-AWS SRP (LH, fluxes): Station was offline, no new fluxes for the moment.Tech-SRP (IB): – CH-CHA SRP (KF): The farmer cut the grass at both parcels (27th . . . Read more

Date: 2018-04-19 Participants / Excused PM, EPL, PL, IB, CE, LH, KF, RM (8) / MG, TB, SB Talking Points Info Please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please send short statement about site to LH (max. 2 . . . Read more

Date: 2018-03-27 Participants / Excused LH, KF, RM, WE, PM, CE, MG (7) / SB, EPL Talking Points Info Please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please send short statement about site to LH (max. 2 sentences) Please . . . Read more

Updated info for EC Raw Binary Format.

Date: 2018-02-22 Participants / Excused LH, PL, KF, PM, MG, IB, CE, EPL / SB, TB Talking Points Info Please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. From now on, Short Reports will be generated for all QA/QC Meetings. Short statement about . . . Read more

Updated FCT to version 0.83 on group drive P:\Flux\RDS_calculations\FRU.

Checking the current raw binary format for CH-FRU. Assuming SONIC R3 and IRGA75. Conversion of file 2018020701.X00 to 201802070100.csv, first 10 lines of .csv file: Columns 1-6: u_ms-1 v_ms-1 w_ms-1 ts_K inc_x_deg inc_y_deg 0.47 -1.53 -0.05 277.96 0 0 0.5 -1.57 -0.01 277.98 0 0 0.55 -1.58 0.02 277.98 0 . . . Read more

Meeting was postponed. Date: 2018-01-18

Installed newest Anaconda on SRP RDS via App-V5. FCT 0.74 –> 0.83 Anaconda –> 5.0.1

Installed newest Anaconda on SRP RDS via App-V5. FCT 0.82 –> 0.83 Anaconda –> 5.0.1