All posts tagged CH-LAS

Short Report – QA/QC Meeting Oct 2020

Meeting Date: 29 Oct 2020  Participants LH, AS, RM, MG, TB (5)   Talking Points CH-DAV PI fluxes (up to Level-4) are now available in FP2020 (1997-2019) Checked fluxes CO2, H2O, CH4 and N2O. Processing for CH-LAS will restart soon.    Info If you are (Tech-)SRP, please attend QA/QC meetings . . . Read more

Short Report – QA/QC Meeting Sep 2020

Meeting Date: 1 Oct 2020  Participants LH, IF, AS, WE (4)   Talking Points Amp v0.16.0-indev, a preliminary version of Amp v0.16.0, is available on the RDS. The delay since the last update was due to difficulties to get Amp running on the RDS. Spectral correction factors checked for various . . . Read more

Short Report – QA/QC Meeting December 2018

Meeting Date: 2018-12-13 Participants LH, EPL, RM, SG, IF, MS, TB (7) Talking Points Info News The automatic fluxes are currently not working due to network permission issues for LH. LH discussed the issues with ISG. LH’s local computer setup will be adjusted maybe before Christmas, maybe after. After then . . . Read more

Short Report – QA/QC Meeting November 2018

Meeting Date: 2018-11-15 Participants / Excused LH, EPL, RM, MG, AR, SG, SB, WE, PL, IF (10) / TB, PM, IB, MS Talking Points Info News The automatic fluxes are currently not working due to network permission issues for LH. LH discussed the issues with ISG. LH’s local computer setup . . . Read more

Short Report – QA/QC Meeting Jan 2019

Meeting Date: 10 Jan 2019 Participants LH, SG, AR, MG, PM, WE, SB, IF, EPL, YaL, CW (guest prof) (11) Talking Points Info Looking back: preliminary 2018 fluxes Note that no plots are shown for sites CH-LAE and CH-LAS since preliminary fluxes are scattered across multiple flux runs and files. . . . Read more

Short Report – QA/QC Meeting October 2018

Meeting Date: 2018-10-18 Participants / Excused MG, SB, IF, RM, EPL, TB, IB, PL (8)  / LH, WE, PM Talking Points Info Meeting Notes GIN TB showed everyone how to create a fieldbook entry when there is a problem with a device or when maintenance is done. TB also showed . . . Read more

Short Report – QA/QC Meeting September 2018

Meeting Date: 2018-09-20 Participants / Excused LH, EPL, IB, TB, RM, MG, PM (7)  / IF, MS Talking Points Info QA/QC Weekly checklist will be expanded: instead of adding Notes to the table, all technical Notes (errors) will be written directly in GIN. The link to the GIN entry will . . . Read more