CH-DAV: 2017

FF-201902

Setup ICOS Setup since 2014 (ETH binary files)
Time Period(s) 2017_1, 2017_2 (results were merged)
Instruments HS50, IRGA72
Final Flux Version
HS50-IRGA72_FF-201902
Scripts FCT 0.86, EP 6.2.0 (Level-1), FM 0.91 (Level-1 merging), FQC 1.03 (Level-2)
Level-1 ID Level-1_ID2019-02-25T202725 / merged results from: ID2019-02-22T210636, ID2019-02-22T210659 / **
Level-2 ID Level-2_QC-20190225-222207 *
Level-3-4 ID
Initiative European Drought Study 2018 (upload 28 Mar 2019)
Flux Calculations By
LH
Meteo Screening By
MG

 

Notes

 

* Level-2 uploaded to European Fluxes Database Cluster for FLUXNET data sharing

** merged results

Last Updated on 18 Feb 2024 22:12