Short Report – QA/QC Meeting Dec 2021

Meeting Date: 21 Dec 2021

Talking Points

  • Automatic conversion of EC binary raw data files to ASCII format is now active for CH-AWS, CH-CHA, CH-FRU, CH-DAS, CH-DAV
    • Files are converted daily.
    • Also generates plots of EC raw data.
    • Example: recent EC raw data files and plots for CH-CHA are found in folder \CH-CHA_Chamau\20_ec_fluxes\2021\raw_data_ascii on gl-processing
  • Database with current data is now active for most CH-DAV data (including CH-DAS FF6) and for CH-CHA 10_meteo.
    • New data from gl-raw are uploaded daily.
    • Database running on gl-calcs, ask LH for access.
    • The name of the time series database is influxdb
    • Recent data can be checked using the GUI (see image).
CH-CHA: Recent 10_meteo data from the last 7 days as displayed directly from the database.
  • List of Variables: there is a list of known variable abbreviations that you can use in case you wonder what an abbreviation means: Variable Abbreviations
    • Currently contains 360 abbreviations.
    • SRPs have Editor rights for this list, which means that SRPs can add and remove (!Dangerdanger!) variables to/from this list.
    • Please add variables that were forgotten.
  • Disk space of the logger will be checked from now on during the weekly data checks here (new Step 4, showstatus): QA/QC Check – Weekly
    • Checking recent fluxes from our stations

     Participants

    LH, MG, IF, SB, RM, LS, TB, MS (8)
     

     Info

    • If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings.
    • SRP & Tech-SRP: please prepare short statement about your site and send to to LH (max. 2 sentences)
    • The purpose of QA/QC meetings is to check on current, incoming data. SRPs choose specific issues we should look at together and discuss in the group. Fluxes are checked if the respective SRP wishes to do so.
    • List of QA/QC Meeting dates: QA/QC Meetings 2022

     Site Reports

    CH-AWS

    Site Info

    CH-CHA

    Site Info

    CH-DAV

    Site Info

    The data gap in July was due to a lack of disk space. To avoid this issue (no disk space) in the future, the disk space is now checked during weekly quality checks.

    CH-DAS

    Site Info

     –

    CH-FRU

    Site Info

    Unfortunately we have a data gap of EC raw data over 2+ week starting at the end of October. IRGA stopped working, sonic data are available.

    CH-LAE

    Site Info

    CH-LAS

    Site Info

    CH-OE2

    Site Info

    The gap in recent data is due to the replacement of the IRGA.

    Last Updated on 14 Feb 2024 03:45