CH-DAV: 2020

FF-202101

Setup ICOS Setup since 2014 (ETH binary files)
Time Period(s) 2020_1, 2020_2 (complete year)
Instruments HS50, HS100, IRGA72
Final Flux Version
HS50-HS100-IRGA72_FF202101
Scripts
BICO v0.5.0, FLUXRUN v0.5.0, DIIVE v0.17.0
Level-1 ID Level-1_FR-20210323-113925 ***
Level-2 ID **soon**
Level-3-4 ID
**soon**
Initiative ICOS Winter 2020 Initiative (13 Apr 2021 upload complete year by MG)
Flux Calculations By
LH
Meteo Screening By
MG

 

Notes

 

*** Level-1 adjusted *_full_output_* file uploaded to EFDC for FLUXNET.

 


 

FF-202008

Setup ICOS Setup since 2014 (ETH binary files)
Time Period(s) 2020_1 (until incl. 30 Jun 2020)
Instruments HS50, IRGA72
Final Flux Version
HS50-IRGA72_FF-202008
Scripts
FCT v0.9.6 with EP 7.0.6, Amp v0.16.0
Level-1 ID Level-1_ID2020-05-25T102707 ***
Level-2 ID on demand
Level-3-4 ID
**soon**
Initiative ICOS Winter 2020 Initiative (original upload 12 Aug 2020)
Flux Calculations By
LH
Meteo Screening By
MG

 

Notes

  • Fluxes were re-calculated and now include all fluxes until 30 Jun 2020, needed for ICOS Winter 2020 Initiative.
  • For more info see here: CH-MULTI / FF-202008.

 

*** Level-1 adjusted *_full_output_* file uploaded to EFDC for FLUXNET.

 


 

FF-202005

Setup ICOS Setup since 2014 (ETH binary files)
Time Period(s) 2020_1 (until incl. 23 April 2020 for Level-2)
Instruments HS50, IRGA72
Final Flux Version
HS50-IRGA72_FF-202005
Scripts
FCT v0.94 with EP 7.0.6, FQC v2.1.0 (Level-2)
Level-1 ID Level-1_ID2020-05-25T102707
Level-2 ID Level-2_QC-20200526-001618
Level-3-4 ID
**soon**
Initiative ICOS Winter 2020 Initiative
Flux Calculations By
LH
Meteo Screening By
MG

 

Notes

  • Level-1 fluxes up until incl. 16 May 2020, but screened meteo data available until incl. 23 April 2020, therefore Level-2 fluxes were only considered until this date.
  • For more info, see here.

 

Last Updated on 18 Feb 2024 22:12