Level-1 and Level-2 fluxes for CH-OE2 2018-2020 are now available on the grasslandserver. Quick info 2018 was re-calculated due to the Wrong Calibration Gas 2017 2019 fluxes are new and were calculated for the first time 2020 fluxes include all available fluxes up until incl. March 2020, to be shared . . . Read more
New site descriptions have been updated for sites CH-CHA, CH-FRU and CH-OE2. Also available now is management info for CH-FRU and info about the crop rotation at CH-OE2. Site info will be further expanded in the near future.
Meeting Date: 10 Jan 2019 Participants LH, SG, AR, MG, PM, WE, SB, IF, EPL, YaL, CW (guest prof) (11) Talking Points Info Looking back: preliminary 2018 fluxes Note that no plots are shown for sites CH-LAE and CH-LAS since preliminary fluxes are scattered across multiple flux runs and files. . . . Read more
Meeting Date: 2018-12-13 Participants LH, EPL, RM, SG, IF, MS, TB (7) Talking Points Info News The automatic fluxes are currently not working due to network permission issues for LH. LH discussed the issues with ISG. LH’s local computer setup will be adjusted maybe before Christmas, maybe after. After then . . . Read more
Meeting Date: 2018-11-15 Participants / Excused LH, EPL, RM, MG, AR, SG, SB, WE, PL, IF (10) / TB, PM, IB, MS Talking Points Info News The automatic fluxes are currently not working due to network permission issues for LH. LH discussed the issues with ISG. LH’s local computer setup . . . Read more
To keep an overview for flux calculations, the EC raw binary format for CH-OE2 is now documented here: EC Raw Binary Format (CH-OE2) Sites for which FRMT files are available: CH-AWS / CH-CHA / CH-DAV / CH-FRU / CH-INO / CH-LAE / CH-LAS / CH-OE2
Meeting Date: 2018-10-18 Participants / Excused MG, SB, IF, RM, EPL, TB, IB, PL (8) / LH, WE, PM Talking Points Info Meeting Notes GIN TB showed everyone how to create a fieldbook entry when there is a problem with a device or when maintenance is done. TB also showed . . . Read more
Meeting Date: 2018-09-20 Participants / Excused LH, EPL, IB, TB, RM, MG, PM (7) / IF, MS Talking Points Info QA/QC Weekly checklist will be expanded: instead of adding Notes to the table, all technical Notes (errors) will be written directly in GIN. The link to the GIN entry will . . . Read more
Meeting Date: 2018-08-23 Participants / Excused LH, IB, PL, MG, PM, CE, RM, SB (8) / EPL, WE, TB, IF, KF Talking Points Info Currently, automatic fluxes are calculated each day for the last 14 days. Most recent flux results are shown here (now deprecated), more information about the . . . Read more
Meeting Date: 2018-07-12 Participants / Excused LH, EPL, PM, IF, RM, KF, WE, MS, IB (9) / SB, MG, TB Talking Points Info Regarding GIN: RSS feed needed so that all news from GIN are automatically displayed on Swiss FluxNet homepage. DO will contact LH or LH will contact DO. . . . Read more
From now on, automatic fluxes for the QVs are shown for the last 14 days (previously 7 days). More information about QV fluxes are given here. Below you can find new fluxes between 1 July and 14 July 2018. CO2 Fluxes Latent Evaporation Fluxes Sensible Heat Fluxes
Meeting Date: 2018-06-14 Participants / Excused LH, MG, EPL, KF, IF, PM (6) / PL, SB, RM Talking Points Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please send short statement about site to . . . Read more
Date: 2018-05-17 Participants / Excused LH, IB, PM, MG, SB, WE, TB, RM, IF, KF, Kritika (internship) Talking Points Info Roadmap Site Reports CH-AWS SRP (LH, fluxes): Station was offline, no new fluxes for the moment.Tech-SRP (IB): – CH-CHA SRP (KF): The farmer cut the grass at both parcels (27th . . . Read more
Date: 2018-04-19 Participants / Excused PM, EPL, PL, IB, CE, LH, KF, RM (8) / MG, TB, SB Talking Points Info Please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please send short statement about site to LH (max. 2 . . . Read more
Date: 2018-03-27 Participants / Excused LH, KF, RM, WE, PM, CE, MG (7) / SB, EPL Talking Points Info Please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please send short statement about site to LH (max. 2 sentences) Please . . . Read more
Date: 2018-02-22 Participants / Excused LH, PL, KF, PM, MG, IB, CE, EPL / SB, TB Talking Points Info Please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. From now on, Short Reports will be generated for all QA/QC Meetings. Short statement about . . . Read more