All posts tagged CH-LAE

CH-LAE: 2018

FF-202101 Current Setup: Setup since 2004 Time Period(s): 2018_1, 2018_2, 2018_3, 2018_4 Instruments: HS50, IRGA72 Final Flux Version: HS50-IRGA72-IRGA75_FF-202101 Scripts: EddyPro 7.0.6, BICO v0.5.1, FLUXRUN v0.5.0, DIIVE v0.19.0-alpha, ReddyProc 1.2 Flux Levels: Level-1: Level-1_DIIVE-20210607-093447 Level-1.1: – Level-2: CH-LAE FP2021 (2004-2020) Level-3-4: PI Dataset: CH-LAE FP2021 (2004-2020) FLUXNET: (soon) FLUXNET Upload: . . . Read more

CH-LAE: 2017

FF-202101 Current Setup: Setup since 2004 Time Period(s): 2017_1, 2017_2 Instruments: HS50, IRGA75, IRGA72 Final Flux Version: HS50-IRGA72-IRGA75_FF-202101 Scripts: EddyPro 7.0.6, BICO v0.5.1, FLUXRUN v0.5.0, DIIVE v0.19.0-alpha, ReddyProc 1.2 Flux Levels: Level-1: Level-1_DIIVE-20210606-105902 (merged results from Level-1 IRGA72 fluxes and Level-1.1 IRGA75 fluxes) Level-1_2017_1_2_IRGA72_FR-20210423-160035 Level-1.1_2017_IRGA75_DIIVE-20210606-105901 Level-1.1: (only IRGA75) CH-LAE FP2021 . . . Read more

CH-LAE: 2016

FF-202101 Current Setup: Setup since 2004 Time Period(s): 2016_1, 2016_2, 2016_3 Instruments: HS50, IRGA75, IRGA72 Final Flux Version: HS50-IRGA72-IRGA75_FF-202101 Scripts: EddyPro 7.0.6, BICO v0.5.1, FLUXRUN v0.5.0, DIIVE v0.19.0-alpha, ReddyProc 1.2 Flux Levels: Level-1: Level-1_DIIVE-20210606-105901 (merged results from Level-1 IRGA72 fluxes and Level-1.1 IRGA75 fluxes) Level-1_2016_2_3_IRGA72_FR-20210424-013350 Level-1.1_2016_IRGA75_DIIVE-20210606-105901 Level-1.1: (only IRGA75) CH-LAE . . . Read more

CH-LAE: 2015

FF-201606 Current Setup: Setup since 2004 Time Period(s): 2015_1 Instruments: HS50, IRGA75 Final Flux Version: HS50-IRGA75_FF-201606 Scripts: EddyPro 6.1.0 (Level-1), DIIVE v0.19.0-alpha, ReddyProc 1.2 Flux Levels: Level-1: Level-1_ID2016-06-10T163549 Level-1.1: CH-LAE FP2021 (2004-2020) Level-2: CH-LAE FP2021 (2004-2020) Level-3-4: PI Dataset: CH-LAE FP2021 (2004-2020) FLUXNET: (soon) FLUXNET Upload: 09 Jun 2021 (Level-1.1 . . . Read more

CH-LAE: 2013

FF-201606 Current Setup: Setup since 2004 Time Period(s): 2013_1 Instruments: HS50, IRGA75 Final Flux Version: HS50-IRGA75_FF-201606 Scripts: EddyPro 6.1.0 (Level-1), DIIVE v0.19.0-alpha, ReddyProc 1.2 Flux Levels: Level-1: Level-1_ID2016-06-10T163630c (corrected for timestamp shift) Level-1.1: CH-LAE FP2021 (2004-2020) Level-2: CH-LAE FP2021 (2004-2020) Level-3-4: PI Dataset: CH-LAE FP2021 (2004-2020) FLUXNET: (soon) FLUXNET Upload: . . . Read more

CH-LAE: 2012

FF-201606 Current Setup: Setup since 2004 Time Period(s): 2012_1 Instruments: HS50, IRGA75 Final Flux Version: HS50-IRGA75_FF-201606 Scripts: EddyPro 6.1.0 (Level-1), DIIVE v0.19.0-alpha, ReddyProc 1.2 Flux Levels: Level-1: Level-1_ID2016-06-11T172208 Level-1.1: CH-LAE FP2021 (2004-2020) Level-2: CH-LAE FP2021 (2004-2020) Level-3-4: PI Dataset: CH-LAE FP2021 (2004-2020) FLUXNET: (soon) FLUXNET Upload: 09 Jun 2021 (Level-1.1 . . . Read more

CH-LAE: 2019

FF-202101 Current Setup: Setup since 2004 Time Period(s): 2019_1_2_4 (IRGA72), 2019_3 (IRGA75) Instruments: HS50, IRGA72, IRGA75 Final Flux Version: HS50-IRGA72-IRGA75_FF-202101 Scripts: EddyPro 7.0.6, FCT 0.9.6, DIIVE v0.19.0-alpha, ReddyProc 1.2 Flux Levels: Level-1: Level-1_DIIVE-20210607-093449 (merged results from Level-1 IRGA72 fluxes and Level-1.1 IRGA75 fluxes) Level-1.1: (only IRGA75) CH-LAE FP2021 (2004-2020) Level-2: CH-LAE . . . Read more

Short Report – QA/QC Meeting May 2021

Meeting Date: 20 May 2021  Participants LH, MS, IF, WE, GA, MG, RM, LS (8)    Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please prepare short statement about your site and send to . . . Read more

Short Report – QA/QC Meeting Apr 2021

Meeting Date: 15 Apr 2021  Participants LH, WE, MB, AS, IF, MG, RM, TB, PM, LS, GA, BP (12)    Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please prepare short statement about your . . . Read more

Short Report – QA/QC Meeting Mar 2021

Meeting Date: 11 Mar 2021  Participants LH, MG, AS, IF, RM, GA, … (6+)   Talking Points Checking recent fluxes from our stations Always keep an eye on the spectral correction factor (scf)    Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed . . . Read more

Short Report – QA/QC Meeting Feb 2021

Meeting Date: 2 Feb 2021  Participants LH, AS, MG, IF, WE, MS, GA, RM (8)   Talking Points Checking recent fluxes from out stations GA will assist in data checks for CH-AWS    Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for . . . Read more

Short Report – QA/QC Meeting Jan 2021

Meeting Date: 7 Jan 2021  Participants LH, TB, MS, IF, RM, MG, PM (7)   Talking Points List of dates: QA/QC Meetings 2021 CH-OE2: Time Lapse Videos from webcam images 2005-2020 are now available: Videos (CH-OE2) Please collect info on the sonic / IRGA settings, e.g. sensor separation between the . . . Read more

Short Report – QA/QC Meeting Nov 2020

Meeting Date: 26 Nov 2020  Participants LH, SB, IF, AS, RM, TB, PM (7)   Talking Points Most recent fluxes CH-LAS is back    Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please prepare . . . Read more

Short Report – QA/QC Meeting Oct 2020

Meeting Date: 29 Oct 2020  Participants LH, AS, RM, MG, TB (5)   Talking Points CH-DAV PI fluxes (up to Level-4) are now available in FP2020 (1997-2019) Checked fluxes CO2, H2O, CH4 and N2O. Processing for CH-LAS will restart soon.    Info If you are (Tech-)SRP, please attend QA/QC meetings . . . Read more

Short Report – QA/QC Meeting Sep 2020

Meeting Date: 1 Oct 2020  Participants LH, IF, AS, WE (4)   Talking Points Amp v0.16.0-indev, a preliminary version of Amp v0.16.0, is available on the RDS. The delay since the last update was due to difficulties to get Amp running on the RDS. Spectral correction factors checked for various . . . Read more

Short Report – QA/QC Meeting Aug 2020

Meeting Date: 20 Aug 2020  Participants LH, IF, MG, SG, PM, RM, MS, AS (8)    Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please prepare short statement about your site and send to . . . Read more

Data sharing: ICOS Winter 2020 Dataset

The ICOS Winter 2020 Dataset aims to help in studying ecosystem interactions both with the COVID-19 outbreak and related lock-downs and the anomalously warm winter season 2019/2020. The ecosystem research community orbiting around ICOS voluntarily created a working group, together with atmospheric and oceanic sciences colleagues, to tackle this issue . . . Read more

Short Report – QA/QC Meeting Mar 2020

Meeting Date: 2 Apr 2020  Participants LH, SG, TB, MG, RM, IF, AS (7)    Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please prepare short statement about your site and send to to . . . Read more

Short Report – QA/QC Meeting Apr 2020

Meeting Date: 30 Apr 2020  Participants MG, SG, AS, RM, IF, … (5+)    Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please prepare short statement about your site and send to to LH . . . Read more