All posts tagged CH-CHA

Short Report – QA/QC Meeting May 2019

Meeting Date: 29 May 2019 Participants LH, MG, SG, WE, PM, RM (6)   Talking Points Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please prepare short statement about your site and send to . . . Read more

CH-CHA: 2015

FF-201605 Setup Setup since 2005 Time Period(s) 2015_1, 2015_2 (results were merged) Instruments R350, QCL Final Flux Version R350-QCL_FF-201605 (v2016-05) Scripts FCT 0.74, EP 6.1.0 (Level-1), FM (Level-1 merging), FQC (Level-2) Level-1 ID Level-1_ID2016-06-07T103201 / merged from: 2015_1: ID2016-06-05T010130, 2015_2: ID2016-06-06T094455 / ** Level-2 ID Level-2_QC-20160607-104039 * Initiative Methane Synthesis . . . Read more

CH-CHA: 2014

FF-201605 Setup Setup since 2005 Time Period(s) 2014_1 Instruments R350, QCL Final Flux Version R350-QCL_FF-201605 (v2016-05) Scripts FCT 0.74, EP 6.1.0 (Level-1), FM (Level-1 merging), FQC (Level-2) Level-1 ID Level-1_ID2016-06-05T010121 Level-2 ID Level-2_QC-20160607-105245 * Initiative Methane Synthesis 2019 (upload 5 May 2019) Flux Calculations By LH Meteo Screening By PK . . . Read more

CH-CHA: 2013

FF-201605 Setup Setup since 2005 Time Period(s) 2013_1 Instruments R350, QCL Final Flux Version R350-QCL_FF-201605 (v2016-05) Scripts FCT 0.74, EP 6.1.0 (Level-1), FM (Level-1 merging), FQC (Level-2) Level-1 ID Level-1_ID2016-06-05T010109 Level-2 ID Level-2_QC-20160607-104747 * Initiative Methane Synthesis 2019 (upload 5 May 2019) Flux Calculations By LH Meteo Screening By PK . . . Read more

CH-CHA: 2012

FF-201605 Setup Setup since 2005 Time Period(s) 2012_2 (there was no QCL in 2012_1) Instruments R350, QCL Final Flux Version R350-QCL_FF-201605 (v2016-05) Scripts FCT 0.74, EP 6.1.0 (Level-1), FM (Level-1 merging), FQC (Level-2) Level-1 ID Level-1_ID2016-05-26T115356 Level-2 ID Level-2_QC-20160607-104509 * Initiative Methane Synthesis 2019 (upload 5 May 2019) Flux Calculations . . . Read more

Short Report – QA/QC Meeting Apr 2019

Meeting Date: 2 May 2019 Participants LH, SG, IF, MG, RM, TB, PM, PL, EPL (9)   Talking Points Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please prepare short statement about your site . . . Read more

CH-CHA: 2016

FF-201902 Setup Setup since 2005 Time Period(s) 2016_1, 2016_2, 2016_3 (results were merged) Instruments R350, IRGA75 Final Flux Version R350-IRGA75_FF-201902 Scripts FCT 0.86, EP 6.2.0 (Level-1), FM 0.91 (Level-1 merging), FQC 1.04 (Level-2) Level-1 ID Level-1_ID2019-03-01T193757 / merged from: 2016_1-3: ID2019-02-27T154133, 2016_2: ID2019-02-27T154512 / separate conversions: 2016_1, 2016_3 in ID2019-02-12T172410; . . . Read more

Short Report – QA/QC Meeting Mar 2019

Meeting Date: 28 Mar 2019 Participants LH, MG, IB, SG, PM, IF, TB, YaL, RM, PL (10)   Talking Points Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can’t, needed for planning of the meetings. SRP & Tech-SRP: please prepare short statement about your . . . Read more

Short Report – QA/QC Meeting Feb 2019

Meeting Date: 7 Feb 2019 Participants LH, EPL, RM, MS, IB, TB, PM, IF, PL, MG (10) Talking Points Info From this meeting on, SRPs choose specific issues we should look at together and discuss in the group. In the past, we mainly went primarily through all fluxes from all . . . Read more

Short Report – QA/QC Meeting Jan 2019

Meeting Date: 10 Jan 2019 Participants LH, SG, AR, MG, PM, WE, SB, IF, EPL, YaL, CW (guest prof) (11) Talking Points Info Looking back: preliminary 2018 fluxes Note that no plots are shown for sites CH-LAE and CH-LAS since preliminary fluxes are scattered across multiple flux runs and files. . . . Read more

Short Report – QA/QC Meeting December 2018

Meeting Date: 2018-12-13 Participants LH, EPL, RM, SG, IF, MS, TB (7) Talking Points Info News The automatic fluxes are currently not working due to network permission issues for LH. LH discussed the issues with ISG. LH’s local computer setup will be adjusted maybe before Christmas, maybe after. After then . . . Read more

Short Report – QA/QC Meeting November 2018

Meeting Date: 2018-11-15 Participants / Excused LH, EPL, RM, MG, AR, SG, SB, WE, PL, IF (10) / TB, PM, IB, MS Talking Points Info News The automatic fluxes are currently not working due to network permission issues for LH. LH discussed the issues with ISG. LH’s local computer setup . . . Read more

Short Report – QA/QC Meeting October 2018

Meeting Date: 2018-10-18 Participants / Excused MG, SB, IF, RM, EPL, TB, IB, PL (8)  / LH, WE, PM Talking Points Info Meeting Notes GIN TB showed everyone how to create a fieldbook entry when there is a problem with a device or when maintenance is done. TB also showed . . . Read more

Short Report – QA/QC Meeting September 2018

Meeting Date: 2018-09-20 Participants / Excused LH, EPL, IB, TB, RM, MG, PM (7)  / IF, MS Talking Points Info QA/QC Weekly checklist will be expanded: instead of adding Notes to the table, all technical Notes (errors) will be written directly in GIN. The link to the GIN entry will . . . Read more

QuickViews Update & A Quick Look at Recent Fluxes

From now on, automatic fluxes for the QVs are shown for the last 14 days (previously 7 days). More information about QV fluxes are given here. Below you can find new fluxes between 1 July and 14 July 2018. CO2 Fluxes Latent Evaporation Fluxes Sensible Heat Fluxes