CH-DAV, Davos


Site News

CH-DAV: 2020
Flux Products

CH-DAV: 2020

FF-202101 Setup ICOS Setup since 2014 (ETH binary files) Time Period(s) 2020_1, 2020_2 (complete year) Instruments HS50, HS100, IRGA72 Final Flux Version HS50-HS100-IRGA72_FF202101 Scripts BICO v0.5.0, FLUXRUN v0.5.0, DIIVE v0.17.0 Level-1 ID Level-1_FR-20210323-113925 *** Level-2 ID **soon** Level-3-4 ID **soon** Initiative ICOS Winter 2020 Initiative (13 Apr 2021 upload complete ... Read More
Short Report – QA/QC Meeting Apr 2021
QA/QC Short Report

Short Report – QA/QC Meeting Apr 2021

Meeting Date: 15 Apr 2021 Participants LH, WE, MB, AS, IF, MG, RM, TB, PM, LS, GA, BP (12) Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can't, needed for planning of the meetings. SRP & Tech-SRP: please prepare short statement about your site ... Read More
Short Report – QA/QC Meeting Mar 2021
QA/QC Short Report

Short Report – QA/QC Meeting Mar 2021

Meeting Date: 11 Mar 2021 Participants LH, MG, AS, IF, RM, GA, ... (6+) Talking Points Checking recent fluxes from our stations Always keep an eye on the spectral correction factor (scf) Info If you are (Tech-)SRP, please attend QA/QC meetings or tell LH if you can't, needed for planning ... Read More

 

Sitemap CH-DAV