CH-LAE: 2020

FF-202006

Setup Setup since 2004
Time Period(s) 2020_1
Instruments HS50, IRGA72
Final Flux Version
HS50-IRGA72_FF-202006
Scripts FCT 0.9.6 with EP 7.0.6 (Level-1), Amp v0.16.0
Level-1 ID
Level-1_ID2020-08-12T001439
Level-2 ID XXX
Level-3-4 ID **soon**
Initiative ICOS Winter 2020 Initiative (original upload 13 Aug 2020)
Flux Calculations By
LH
Meteo Screening By
AS

 

Notes

  • Fluxes were re-calculated and now include all fluxes until 30 Jun 2020, needed for ICOS Winter 2020 Initiative.
  • For more info see here: CH-MULTI / FF-202008.

 

*** Level-1 adjusted *_full_output_* file (merged) uploaded to EFDC for FLUXNET.

 


FF-202006

Setup Setup since 2004
Time Period(s) 2020_1
Instruments HS50, IRGA72
Final Flux Version
HS50-IRGA72_FF-202006
Scripts FCT 0.9.6 with EP 7.0.6 (Level-1), FQC 2.1.2 (Level-2)
Level-1 ID
Level-1_ID2020-06-15T110137
Level-2 ID Level-2_QC-20200627-011158
Level-3-4 ID **soon**
Initiative ICOS Winter 2020 Initiative
Flux Calculations By
LH
Meteo Screening By
MG

 

Notes

  • Level-1 fluxes up until incl. 31 May 2020, but screened meteo data available until incl. 27 May 2020 13:30, therefore Level-2 fluxes were only considered until this date.
  • For more info, see here.