CH-AWS: 2009

FF-202002

Setup Mobile Setup 2006-2016
Time Period(s) 2009_1
Instruments R2, IRGA75
Final Flux Version
R2-IRGA75_FF-202002
Scripts FCT 0.93, EP 7.0.6 (Level-1), Amp v0.16.0
Level-1 ID
Level-1_ID2020-02-11T130747 ***
Level-2 ID Level-2_AMP-20200224-152649
Level-3-4 ID ***soon***
Initiative Manuscript SG / ICOS Winter 2020 Initiative (original upload 11 Aug 2020)
Flux Calculations By
LH
Meteo Screening By
SG (Meteo for fluxes) / WE (Meteo for upload)

 

Notes

 

*** Level-1 adjusted *_full_output_* file uploaded to EFDC for FLUXNET.