CH-CHA: 2020

FF-202008

Setup Setup since 2005
Time Period(s) 2020_1, 2020_2, 2020_3, 2020_4 (results were merged)
Instruments R350, IRGA75
Final Flux Version R350-IRGA75_FF-202008
Scripts FCT v0.9.6 (Level-1 calcs), FQC v2.1.2 (Level-2 QC), Amp v0.16.0
Level-1 ID Level-1_ID2020-08-06T232655 ***
Level-2 ID Level-2_QC-20200809-012239
Level-3-4 ID soon
Initiative ICOS Winter 2020 Initiative (upload 9 Aug 2020)
Flux Calculations By
LH
Meteo Screening By
IF

 

Notes

  • First final flux calculations for 2020, until incl. 30 Jun 2020.
  • For more info, see here: CH-CHA / FF-202008.

*** Level-1 adjusted *_full_output_* file uploaded to EFDC for FLUXNET.