CH-CHA: 2013

FF-201605

Setup Setup since 2005
Time Period(s) 2013_1
Instruments R350, QCL
Final Flux Version
R350-QCL_FF-201605 (v2016-05)
Scripts FCT 0.74, EP 6.1.0 (Level-1), FM (Level-1 merging), FQC (Level-2)
Level-1 ID Level-1_ID2016-06-05T010109
Level-2 ID Level-2_QC-20160607-104747 *
Initiative Methane Synthesis 2019 (upload 5 May 2019)
Flux Calculations By
LH
Meteo Screening By
PK

 

Notes

 

* Level-2 uploaded to European Fluxes Database Cluster for FLUXNET data sharing

** merged results

Last Updated on 10 Aug 2020 00:39