CH-LAE: 2013

FF-201606

Setup Setup since 2004
Time Period(s) 2013_1
Instruments HS50, IRGA75
Final Flux Version
HS50-IRGA75_FF-201606
Scripts FCT 0.74, EP 6.1.0 (Level-1), FQC (Level-2)
Level-1 ID
Level-1_ID2016-06-10T163630
Level-2 ID Level-2_QC-20160630-204228 *
Level-3-4 ID Level-3-4_FLUXNET2015-FN-20161021
Level-3-4_FLUXNET2015-FN-20190607-beta-3
Initiative FLUXNET2015 dataset (upload 30 Jun 2016)
Flux Calculations By
LH
Meteo Screening By
PK

 

Notes

  • Known issues: The timestamp seems to be shifted for some days at the start of July 2013.

CH-LAE 2013: Shifted timestamp in July 2013, flux version Level-3-4_FLUXNET2015-FN-20190607-beta-3

 

* Level-2 uploaded to European Fluxes Database Cluster for FLUXNET data sharing